To keep the rails free of snow and ice in the cold and high-rainfall
season sprinkler systems have been installed to meet the high quality
standards of the Shinkansen railway network. Up to now, the pipelines
mentioned were made of steel. Corrosion in the steel pipelines is caused
by the seasonal system stop during the warm summer time which in
conclusion caused a malfunction of the deicing when it was needed.
For the new train section Tokyo - Shin Aomori high quality PE 100
E-fittings and special components from AGRU have been used in order to
fulfil the stringent requirements in this installation. Additional
expansions were installed only with PE 100 piping systems whereby
products of AGRU have provided a very important contribution.
For the sprinkler system at the Shinkansen highspeed railway track AGRU
E-couplers in the dimensions OD 110 mm to OD 400 mm were applied because
of the easy and safe installation at the rail track. Furthermore
moulded AGRU sweep bends OD 125 mm to OD 400 mm were applied to ensure
excellent flow characteristics and high pressure ratings of the
installed piping system.
the Tōkaidō Shinkansen often experiences heavy snow in the area around
Maibara Station in winter. Trains have to reduce speed, which can
disrupt the timetable. Sprinkler systems were later installed, but
delays of 10 to 20 minutes still occur during snowy weather.
Additionally, tree falls related to excess snow have caused service
interruptions. Along the route of the Jōetsu Shinkansen, winter snow can
be very heavy, with snow depths of two to three metres, so the line is
equipped with stronger sprinklers and slab track, to mitigate the
effects of deep snow.
high speed rail,bullet trains
No comments:
Post a Comment